At T.T.E. Engineering (M) Sdn. Bhd., we are committed to ensuring and maintaining the highest quality in providing our services. Our princliples of Quality Management are as follow:
We utilize an internal quality control system to ensure quality of works are maintained throughout the duration of the project.
Project Implementation of Quality Control System Diagram
Commencement Meeting
Meeting to identify problems, conducted prior to starting construction. Confirm the suitability of design and planning, safety, personnel deployment. At the meeting, feedback on past successes and failures to prevent recurrence of mistakes. Decide on inspection schedule.
Progress Inspection
Periodic inspection conducted during construction of the project to ensure proper installation.
Completion Inspection
Inspection carried out prior to completion of the project. Inspect the adequacy of functions of installed facilities, or whether there are problems in the operation system.
Final Meeting
Meeting after completion of the project. Confirm as-built drawings and to determine a support system for future projects.